Experiment No. : -08
Aim of the Experiment: –
To develop the Hydro-thermal power system using linearized models and study the impact of Hydropower system on frequency regulation services.
Abstract: –
Apparatus Required:-
Simulation Model: –
Theory: –
Result: –
Conclusion: –
To be written by student.